Sarah Mildred Long Bridge

Control System Design

Sarah Mildred Long Bridge

Panatrol was contracted to construct the controls of the Sarah Mildred Long Bridge.

Scope:

  • Cold Backup PLC system
  • Completely HMI controlled
  • No Pilot Device operators
  • Redundant HMIs on operator console
  • Tower Drive Lift Bridge
  • Required Skew Control using networked absolute encoders
  • Panatrol’s proprietary skew control algorithm kept a 300 ft long movable span within 1/2 inches of height difference from end to end